²£«~¸Ô±¡¸ê®Æ
DCS«Y²Î¦w¸Ëªº¥~³¡±ø¥ó
1¡B ±±¨î«Ç©M¾Þ§@«ÇÀ³¨ã³Æ¨Ï¥Î±ø¥ó¡G
¦b¦w¸Ë«e¡A±±¨î«Ç©M¾Þ§@«Çªº¤g«Ø¡B¦w¸Ë¡B¹q®ð¡B¸Ëפuµ{¥þ³¡§¹¤u¡A«Ç¤º¸Ë¹¢²Å¦X³]pn¨D¡AªÅ½Õ¾÷±Ò¥Î¡A¨Ã°t¦³§l¹Ð¾¹¡F
¨äÀô¹Ò·Å«×¡BÀã«×¡B·Ó©ú«×¤ÎªÅ®ðªºÐä¤Æµ{«×²Å¦XDCS«Y²Î¹B¦æ±ø¥ó¤~¥i¶}½c¦w¸Ë¡C
2¡B ¹ï¦w¸Ë¤Hûªºn¨D¡G
¦w¸Ë¤Hû«O«ù²M¼ä¡A¨ì±±¨î«Ç©Î¾Þ§@«Ç¤u§@´«¤W·FÐ䪺©ì¾c¡A¤w¨¾¦Ç¹Ð¶i¤JDCS«Y²Î¸Ë¸m¤º¡F
nºÉ¶qÁקKÀR¹q·PÀ³¹ï«Y²Î¤¸¾¹¥óªº¼vÅT¡A½Õ¸Õ®É¡A¤£¬ï¤ÆÅÖµ¥®e©ö²£¥ÍÀR¹qªºÂ´ª«¡C
¾÷¡BÂd¡B½L¹B¿é»P¦w¸Ë
¾÷¡BÂd¡B½Ln¨D¾ãÅé¹B¿é¨ì±±¨î«Ç¡A¦w¸Ë«e©î½c¡C
DCS«Y²Îµw¥ó¥]¸Ë½c¦b¹B¿é¡B¶}½c¡B·h¹B®É¤p¤ß¡A¨¾¤î¶ÉË©M²£¥Í±j¯P®¶°Ê¡A¥H§K³y¦¨·N¥~·l¥¢¡C
¶}½c®Én¦³³]³Æ¨ÑÀ³³¡ªù¤Hû©M±µ¡B«O¡BÀ˳¡ªù¤Hû¦b³õ¦@¦PÀˬd¥~Æ[½è¶q¡B³]³Æ¤º³¡¥d¥ó±µ½uªº¯Ê³´¡B«Y²ÎÀH¾÷±a¨Óªº¤å¥ó¡B¸ê®Æµ¥¡A¨Ã°µ¦n°O¿ý¡Añ¦r½T»{¡C
DCS«Y²Î±±¨î«Ç³q±`¦³500mm¥ª¥kªº¨¾ÀR¹q¡B¨¾¼é¦aªO¡A¦]¦¹n¦Ò¼{¦n©³®y°ª«×¡A¨Ã«OÃÒ¨äéw©Ê©M±j«×¡C
^¤å²£«~¸Ô²Ó«H®§
External conditions for DCS system installation
1. The control room and operation room should have the following conditions for use:
Before installation, the civil, installation, electrical, and decoration works of the control room and operation room must be completed, and the indoor decoration must meet the design requirements. The air conditioning unit must be activated and equipped with a vacuum cleaner;
Only when the ambient temperature, humidity, lighting level, and air purification level meet the operating conditions of the DCS system, can they be unpacked for installation.
2. Requirements for installation personnel:
The installation personnel must maintain cleanliness, and when working in the control room or operation room, they must wear clean specialized slippers to prevent dust from entering the DCS system device;
Avoid the impact of Electrostatic induction on system components as much as possible. During debugging, do not wear chemical fibers and other fabrics that are prone to static electricity.
Transportation and installation of machines, cabinets, and panels
The machine, cabinet, and panel are required to be transported as a whole to the control room and unpacked before installation.
The DCS system hardware packaging box must be carefully transported, unpacked, and handled to prevent tipping and strong vibration, in order to avoid accidental losses.
When opening the box, personnel from the equipment supply department, as well as personnel from the reception, maintenance, and inspection departments, should be present to jointly inspect the appearance quality, defects in the internal card wiring of the equipment, documents and materials randomly brought by the system, and make records and sign for confirmation.
The DCS system control room usually has an anti-static and moisture-proof floor of about 500mm, so it is necessary to consider the height of the base and ensure its stability and strength.
§K³dÁn©ú¡G
AMIKON§Ú̾P°â·s²£«~©M°±²£²£«~¡A¿W¥ß´ë¹DÁʶR¦¹Ãþ¯S¦â²£«~¡Cªü¦Ì±±¤£¬O¥»ºô¯¸¯S¦â²£«~ªº±ÂÅv¤À¾P°Ó¡B¸g¾P°Ó©Î¥Nªí¡C¥»ºô¯¸¤W¨Ï¥Îªº©Ò¦³²£«~¦WºÙ/²£«~¹Ï¤ù¡B°Ó¼Ð¡B«~µP©MÀ²¼Ð§¡¬°¨ä¦U¦Û©Ò¦³ªÌªº°]²£¡C±a¦³³o¨Ç¦WºÙ,¹Ï¤ù¡B°Ó¼Ð¡B«~µP©MÀ²¼Ðªº²£«~´yz¡B´y¼g©Î¾P°â¶È¥Î©óÃѧO¥Øªº¡A¨Ã¤£ªí¥Ü»P¥ô¦óÅv§Q«ù¦³¤H¦³¥ô¦óÃöÁp©Î±ÂÅv¡C
ABB | Honeywell | Woodward |
CS31 ECZ FPR3700001R0001 | C7076A1015 | 9905-463 |
ICSI16E1 FPR3316101R1032 | C7061F2001 | 5463-785 |
ICSK20F1 FPR3327101R1202 | ACX633 51196655-100 | 5463-473 |
PP836A 3BSE042237R2 | ACX631 51198947-100 | 5464-414 |
3BHB004744R0010 XVC517 | 942-M0A-2D-1G1-220S | 5464-544 |
NGPS13C 3AUA0000042489 | 942-A4M-2D-K220S | 5463-581 |
PP235 3BSC690102R2 | 900H03-0102 | 5464-013 |
DSTD110A YB161102-AM | 900G32-0001 | 5464-211 |