§A¦n¡AÅwªï¨Ó¨ì¥@¾Tºô [½Ðµn¿ý] [§K¶Oª`¥U]
¥@¾Tºô ¾T·~²£«~
±z·í«eªº¦ì¸m¡G ¥@¾Tºô ¾T·~²£«~ ¾T«¬§÷ ADV151-P50 S2 ¼Æ¦r¿é¤J¼Ò¶ô 3

ADV151-P50 S2 ¼Æ¦r¿é¤J¼Ò¶ô

¥[¤J¦¬Âà Á|³ø
¸Ô²Ó«H®§

²£«~¼ÐÃD:¶}Ãö¶q¿é¥X¼Ò¶ô_Yokogawa ADV151-P50 S2 ¼Æ¦r¿é¤J¼Ò¶ô

«¬¸¹¡G ADV151-P50 S2

«~µP¡GYokogawa

                                                                                 ²£«~¸Ô±¡¸ê®Æ¡G


¥\¯à·§­z¤UªíÁ`µ²¤FMVME172LX VME´O¤J¦¡±±¨î¾¹ªº¥\¯à¡C·L³B²z¾¹60MHz MC68060©Î64MHZ MC68LC060³B²z¾¹¥~§Î¤Ø¤o6U VMEbus¤º¦s4/8/16/32/64MB¥æ¿ù¡AECC«OÅ@DRAM©Î4/8/16MB©_°¸«OÅ@DRAM 128KB SRAM¡A±a³Æ¥Î°{¦s¤@­ÓIntel 28F016SA 2MB 8¦ì°{¦s³]³Æ

1¡BÀˬd©PÃ䱡ªp¡X¡X¥J²ÓÀˬdÅÜÀW¾¹©M©PÃäÀô¹Òªº³q­·¤Î·Ó©ú±¡ªp¡C­n½T«O³q­·³]³Æ¯à°÷¥¿±`¹BÂà¡A·Ó©ú³]³Æ¯à°÷¥¿±`¨Ï¥Î¡C

2¡BÀˬd¤º³¡¹qÆl¡X¡X¥´¶}ÅÜÀW¾¹Âdªù¡AÀˬd¤º³¡¹qÆl¬O§_¦³·lÃa¡B¹qÆl¶¡ªº³s±µ¬O§_¥¿½T¥i¾a¡B©Ò¦³±µ¦a½u¬O§_¨c©T¥i¾a¡B±µ¦aÂI¬O§_¦³¥Íù×°ÝÃD¡CÅÜÀW¾¹¤ºªº©Ò¦³Á³®ê©MÁ³¥ÀÀ³¸Ó¨C¥b¦~ºò©T¤@¦¸¡A½T«O³s±µ¥i¾a¡C

3¡BÀˬd©Ò¦³¹q®ð³s±µªººò©T«×¡X¡X¬d¬ÝÅÜÀW¾¹¤º©Ò¦³¦^¸ô¬O§_¦³²§±`ªº©ñ¹q²ª¸ñ¡A¬O§_¦³©Ç¨ý¡BÅܦâ¡Bµõ¯¾¡B¯}·lµ¥²{¶H¡CÀˬd©Ò¦³¥\²v³æ¤¸ªº¥úÅÖ¦³µL·lÃa©ÎªQ°Ê¡A¬O§_¨C­Ó³£´¡ºò¡C

4¡B´ú¶qÅÜÀW¾¹µ´½t¡X¡X¨C¦¸°±¾÷«áªø®É¶¡«ì´_¹B¦æ¡AÀ³¥Î2500Vªº¥ü¼Úªí¹ïÅÜÀW¾¹¤Î®Ç³qÂdªº¥D¦^¸ô¶i¦æµ´½t´ú¸Õ¡A½T«O´ú¸Õ¦X®æ«á¤è¥i°_°Ê¡C

5¡B»{¯u¬d¿ò¡X¡X¨C¦¸ºûÅ@ÅÜÀW¾¹«á¡A­n¥J²ÓÀˬdÅÜÀW¾¹Âd¤º¥~¦³µL¿òº|ªºÁ³µ·¡B¼u®¤ù¡BÁ³®ê¤Îª÷Äݾɽuµ¥ª««~¡A¨¾¤î¤pª÷Äݪ««~¦bÅÜÀW¾¹­·¾÷°_°Ê«á³Q§l¤J¤º³¡¡A³y¦¨ÅÜÀW¾¹µu¸ô¨Æ¬G¡C

6¡B***²M¼ä¡X¡X¥Î±a¶ì®Æ§l¼Lªº§l¹Ð¾¹©ÎªÅÀ£¾÷µ¥***²M¼äÅÜÀW¾¹¤º¥~¤Î°t¹q«Ç¡A***³]³Æ©P³òµL¹L¶qªº¹Ð®J¡A½T«O¹B¦æÀô¹Ò²M¼ä¡C

7¡B±Ò°Ê«eÀˬd¡X¡X¯S§O¬O¹ï¹q®ð¦^¸ô¶i¦æ¸û¤j§ï°Ê«á¡A­nÀˬd©Ò¦³¹q®ð³s±µ¬O§_¥¿½T¡B¨c©T¡A¨¾¤î¡§¤Ï°e¹q¡¨¨Æ¬Gªºµo¥Í¡C¹ï©ó¨Ñ¤ô«Y²Î¶i¦æªº±±¨î¡AÂk®Ú¨ì©³¬O¬°¤Fº¡¨¬¥Î¤á¹ï©ó¬y¶qªº»Ý¨D¡C¦b°ª®p®É´Á»Ý¨D¶q¤j¡A»Ý¯à§Ö³t¨Ñ¤ô¡F§C®p®ÉÀ³ºû«ùºÞÀ£¡C¨ä***®Ú¥»ªº±±¨î¹ï¶H¬O¬y¶q¡AÀ£¤O³Q¥Î¨Ó°µ¬°±±¨î¬y¶q¤j¤pªº°ÑÅܶq¡C¦pªG«O«ù¨Ñ¤ô«Y²Î¬Y³BÀ£¤OªºùÚ©w¡A¤]´N***¸Ó³Bªº¨Ñ¤ô¯à¤O©M¥Î¤ô¬y¶q³B©ó¥­¿Åª¬ºA¡A¥iº¡¨¬¥Î¤áªº¥Î¤ô»Ý¨D¡C

                          ²£«~­^¤å¸Ô±¡¸ê®Æ¡G

Summary of Features The following table summarizes the features of the MVME172LX VME embedded controller.Microprocessor 60MHz MC68060 or 64MHZ MC68LC060 processor Form factor 6U VMEbus Memory 4/8/16/32/64MB interleaved, ECC-protected DRAM or 4/8/16MB parityprotected DRAM 128KB SRAM with battery backup Flash memory One Intel 28F016SA 2MB 8-bit Flash device

1. Check the surrounding conditions - carefully check the ventilation and lighting conditions of the frequency converter and the surrounding environment. To ensure that ventilation equipment can operate normally and lighting equipment can be used normally.


2. Check internal cables - Open the door of the frequency converter cabinet and check if there is any damage to the internal cables, whether the connections between the cables are correct and reliable, whether all grounding wires are firm and reliable, and whether the grounding points are rusty. All bolts and nuts inside the frequency converter should be tightened every six months to ensure reliable connection.


3. Check the tightness of all electrical connections - check all circuits inside the frequency converter for any abnormal discharge marks, strange odors, discoloration, cracks, damages, etc. Check if the optical fibers of all power units are damaged or loose, and if each is securely inserted.


4. Measure the insulation of the frequency converter - After each shutdown, resume operation for a long time. Use a 2500V megohmmeter to conduct insulation testing on the main circuit of the frequency converter and bypass cabinet, and ensure that the test is qualified before starting.


5. Careful inspection - After each maintenance of the frequency converter, it is necessary to carefully check whether there are any missing screws, spring plates, bolts, and metal wires inside and outside the frequency converter cabinet to prevent small metal items from being sucked into the interior after the frequency converter fan starts, causing a short circuit accident of the frequency converter.


6. * * * Cleaning - Use a vacuum cleaner or air compressor with a plastic suction nozzle to clean the inside and outside of the frequency converter and the distribution room. There should be no excessive dust around the equipment to ensure a clean operating environment.


7. Pre startup inspection - especially after major changes are made to the electrical circuit, all electrical connections should be checked for correctness and firmness to prevent the occurrence of "reverse power transmission" accidents. The control of the water supply system is ultimately aimed at meeting the flow needs of users. During peak periods, there is a high demand for fast water supply; Maintain a certain pipe pressure during low peaks. The fundamental control object of * * * is the flow rate, and pressure is used as a parameter variable to control the flow rate. If the pressure at a certain point in the water supply system is kept constant, the water supply capacity and water flow at that point are in a balanced state, which can meet the water needs of users.

§K³dÁn©ú¡G

AMIKON§Ú­Ì¾P°â·s²£«~©M°±²£²£«~¡A¿W¥ß´ë¹DÁʶR¦¹Ãþ¯S¦â²£«~¡Cªü¦Ì±±¤£¬O¥»ºô¯¸¯S¦â²£«~ªº±ÂÅv¤À¾P°Ó¡B¸g¾P°Ó©Î¥Nªí¡C¥»ºô¯¸¤W¨Ï¥Îªº©Ò¦³²£«~¦WºÙ/²£«~¹Ï¤ù¡B°Ó¼Ð¡B«~µP©MÀ²¼Ð§¡¬°¨ä¦U¦Û©Ò¦³ªÌªº°]²£¡C±a¦³³o¨Ç¦WºÙ,¹Ï¤ù¡B°Ó¼Ð¡B«~µP©MÀ²¼Ðªº²£«~´y­z¡B´y¼g©Î¾P°â¶È¥Î©óÃѧO¥Øªº¡A¨Ã¤£ªí¥Ü»P¥ô¦óÅv§Q«ù¦³¤H¦³¥ô¦óÃöÁp©Î±ÂÅv¡C

LLEN-BRADLEY1746-HSCEEMERSONKJ3002X1-BG2 12P1731X032 VE4003S5B1
ALLEN-BRADLEY1746-HSRVEMERSONKJ3002X1-BG2 12P1731X062
ALLEN-BRADLEY1746-HTEMERSONKJ3002X1-BG2 12P1731X082 ťVE4003S5B1
ALLEN-BRADLEY1746-IA16EMERSONKJ3007X1-EA1 12P2413X032
ALLEN-BRADLEY1746-IA8EMERSONKJ3101X1-BA1 12P1865X062
ALLEN-BRADLEY1746-IB32EMERSONKJ3101X1-BA1 12P1865X062 VE4011B1
ALLEN-BRADLEY1746-IC16EMERSONKJ3101X1-BB1 12P1866X072 VE3006
ALLEN-BRADLEY1746-IH16EMERSONKJ3102X1-BA1 12P1863X082 VE4012S2B2
ALLEN-BRADLEY1746-IM8EMERSONKJ3201X1-BA1 12P2535X042 VE4001S2T2B2
ALLEN-BRADLEY1746-IN16EMERSONKJ3201X1-BA1 12P2535X052













Áp«Y¤è¦¡
  • Áp«Y¤H¡G §d¤u ¤k¤h
  • ¹q¸Ü¡G 0592-5085207
  • ¤â¾÷¡G 18030175270
  • ¦a§}¡G ºÖ«Ø¬Ù ·Hªù¥« «ä©ú°Ï´òÀØ«n¸ô388¸¹°ê¶T¤j·H32D³æ¤¸
ÁÙ¨S§ä¨ì¦X¾Aªº²£«~¡H